Home Contact Links  
 
About UsServicesProjects/ClientsCurrent EventsCareer Opportunities 

Projects/Clients
Re
  SOUTHWEST

Aviation Alliance Inc.

To view other projects, click the state below

AL | AR | AZ | CO | IA | ID | KS | KY | LA | MI | MN | NC | NM | OH | OK | OR | TN | TX | VA | WI | INT

  
  ARKANSAS
 
 

Benton - Saline County Regional - SUZ

• AWOS II

Engineering design/bid services and basic construction support services for a new AWOS II.

  Benton - Saline County Regional - SUZ

• Taxiway A Lighting and Signage

This project included engineering design and bid phase services for new medium intensity edge lighting system for Taxiway A. The edge light system consisted of new light fixtures, cable, conduit and transformer housings (cans). Other improvements included electrical vault modifications associated with the new edge lighting.

 

Bentonville - Bentonville Municipal/Louise M Thaden Field

• Perimeter Fence Obstruction Lighting

 

Fayetteville - NW Arkansas Regional - XNA

Aviation Alliance, Inc. was responsible for all electrical design plans and specifications for this project. The project expands the Terminal Apron on three sides and adds an exit taxiway between the Terminal Apron and taxiway parallel to the runway. Our work encompassed taxiway/taxilane edge lighting, can and conduit installation for future taxiway and taxilane centerline lighting, fence obstruction lighting, new duct banks, fiber optic cable, relocation of ground service equipment (GSE) power service and power pedestals, and surface sensor cable extensions.

  Fayetteville - NW Arkansas Regional - XNA

NW Arkansas Regional (XNA) - Phase II Cargo Apron & Conn. TW

  Fayetteville/Springdale - NW Arkansas Regional - XNA

Cargo Apron Connecting Taxiway G

  Fayetteville/Springdale - NW Arkansas Regional - XNA

Alternate Landing Surface NAVAIDS

The project included design of NAVAIDs and visual approach aids for an 8800' parallel taxiway to serve as an alternate landing surface. Airfield electrical design consisted of a new MALSR system for each end of the landing surface. Provisions for installing two new GFM ILS systems (LOC w/DME) and adjusting existing glideslope antennae to serve the landing surface were also included. Additional services for this project included installation of GFM equipment shelters and demolition/relocation of ILS equipment for Runway 16-34.

  Fayetteville/Springdale - NW Arkansas Regional - XNA

Reconstruction Runway 16/34

The project included design of new edge lighting, signage, and FAA NAVAID improvements required for the reconstruction of pavement for an existing runway 8800' long. Airfield electrical design also included replacement of existing runway pavment surface sensing equipment and system.

  Fayetteville/Springdale - NW Arkansas Regional - XNA

Taxiway A

The project included design of an 8800' parallel taxiway, 100 feet wide with 25 feet wide shoulders, to serve as an alternate landing surface. Airfield electrical design consisted of a new taxiway edge light system and signage on new, dedicated circuits. Provisions for use as an alternate landing surface included a separate edge light system with runway signage. Additional services for this project included separate construction packages for site preparation and paving/electrical work. The paving/electrical package was bid with phased base bid and eight bid alternates, requiring ten separate construction cost projections.

Close

  Fort Smith - Fort Smith Regional - FSM

2010 Airfield Electrical Improvements

Engineering design/bid services and basic construction support services for a new high intensity runway lighting (HIRL) system for Runway 7-25. Other work included new cabling to existing runway distance remaining signs.

  Fort Smith - Fort Smith Regional - FSM

Taxiway A (West) Widening

Engineering design/bid services and basic construction support services for a new edge light system with new cable, conduit and transformer housings. Work also included the replacement of existing halogen fixtures with LED and associated lighted guidance signs.

  Fort Smith - Fort Smith Regional - FSM

Reconstruction of Taxiway B (Phase II)

Engineering design/bid services for new LED edge lighting for the existing portion of and for the extension of Taxiway B. The upgrade consisted of replacing existing stake mounted fixtures with LED fixtures on existing bases and new LED fixtures for existing stake mounted lights. Other work included replacement of runway exit signs on existing foundations, as well as new base mounted edge lights and guidance signs for the taxiway extension.

 

Little Rock - Adams Field - LIT

• Runway 22L Instrument Landing System Consultation

 

Rogers - Rogers Municipal/Carter Field - ROG

• Runway 1-19 Safety Area Improvements

This project consists of providing 1,000-foot extended safety areas off both ends of Runway 1-19 and providing grading to the extent feasible for the critical grading area of a future proposed capture effect glide slope (CEGS) to replace the existing end-fire glide slope (EFGS). Aviation Alliance's responsibilities are: 1) Review of the grading plans; 2) Plans and specifications for the demolition of the existing R/W 19 MALSR and installation of a new FAA-supplied DME Corp MALSR; 3) Temporary lighting and signage for the construction displacement of R/W 19 threshold; and 4) FAA coordination at the Regional, SMO, and SSC levels. Construction support services also will be provided.

Close