• Reconstruction of Runway 4R/22L and Associated Taxiways
Provided engineering planning and design phase services for the airfield lighting, signage, and NAVAIDS portion of the Reconstruction of Runway 4R/22L & Associated Taxiways project. New runway centerline, edge and RWSL infrastructure were included. Design of a new airfield lighting vault to replace the existing vault in the terminal being demolished was also included. The work was constructed in four separate packages: 1) Taxiway Z, 2) Electrical Vault, 3) Runway 4R-22L North End, and 4) Runway 4R-22L South End.